logo

element-banner-water-940x246
element-banner-water-940x246
element-banner-leaf-940x246
element-banner-leaf-940x246
element-banner-earth-940x246
element-banner-earth-940x246

Project: Transpacific Leachate Facility – Engineering Design

Transpacific-460x210

Client: Henry and Hymas (for Transpacific)

Location: Erskine Park

Services Provided: Engineering design, commissioning and support.

Project details:
KMH was engaged by Henry and Hymas to design and assist in vendor/technology selection of suitable leachate treatment equipment for the Transpacific leachate treatment facility in Erskine Park, Sydney. KMH designed a 750kl/d ($2.5M turnkey solution) biological leachate treatment facility, using sequential bioreactor design as preferred technology to achieve the client’s requirements. Work involved reviewing pilot plant data, providing all necessary design calculation, performance grantee, documentation and assist/recommend suitable equipment suppliers, evaluate opportunities to reduce cost, attend HAZOP and commissioning support for the facility.