Project: Barwon Water Sludge Drying Project

Barwon-Water-Biosolids-Facility-460x210

Client: Barwon Water

Location: Geelong, Victoria

Services Provided:  Designed ventilation and air pollution control systems.

Project details:
KMH undertook engineering design and support inclusive of design of all emission control equipment for the Seghers sewage sludge drying and pelletising facility being developed near Geelong as a Private Public Partnership with the Victorian Government for Barwon Water.  The emission controls include a vent gas Regenerative Thermal Oxidiser, and a large bio-filter. When complete this facility will be the most advanced sewage sludge treatment facility in Australia.  KMH have provided commissioning support including training workshops and material for the operating team.